GEnx-powered 787 achieves first flight

The first 787 test aircraft powered by GEnx-1B engines completed its first flight late Wednesday, landing at Boeing Field in Seattle at 6:29 p.m. local time following a 3 hr. 48 min. flight.

The aircraft is the fifth of six 787s in the Dreamliner flight test program (ATW Daily News, April 22). A second GEnx-1B-powered 787 will take flight before the end of July, Boeing said.

Link to the original site

Similar Posts:

No tags for this post.

Leave a Reply